Dig Fill logo
Groundworks trench layout
🔒 Pro Feature Array

Never Over-Order a Tonne of Sharp Sand Again.

Trench isolates exact structural layers — including bedding material types, pipe surrounds, and loose granular backfill metrics — automatically deducting outside diameter (OD) displacement.

7-day free trial evaluations. No card validation required.

Sound Familiar on Your Sites?

These aren't hypothetical operational anomalies. They recur daily when tracking materials with raw cubic guesses.

📈

8–15% Wasted Material Costs

Without reliable step-by-step weight parameters, site teams instinctively add padding to prevent shortfalls, burning contract margins down in real time.

🚛

Surplus Lorry Load Charges

A partial delivery vehicle return still costs a full merchant logistical cycle premium. Material left unplaced at the edge of the pit highlights a scheduling breakdown.

🧾

Unyielding Aggregate Invoicing

Suppliers bill strictly against gross delivered weight tickets. Unused pea shingle mixed with topsoil cannot be returned for credits.

What you unlock with Pro

Exact Tonnages. Component Layers. Every Line.

  • 🥞

    Isolated Stratum Calculation Logs

    Bedding tracks, pipe surrounds, and final backfills are verified separately. Dispatch precise supply orders down to individual material specification groups.

  • True Outside Diameter (OD) Displacement

    Calculates actual structural displacement bounds rather than internal nominal diameters, accurately subtracting pipe profiles across shared fill runs.

  • 🚚

    Haulage Load Allocation Frameworks

    Toggle delivery unit classes—including standard grab setups, tippers, or multi-axle articulators—to evaluate true delivery schedules.

🔒

Trench Console Access Restricted

Activate your premium profile status or test capabilities completely uninhibited within our active validation tier.

Start Free Trial

Codified Engineering Alignment

Calculations directly conform with current UK operational specifications.

BS EN 1295-1 Building Regs Part H